The global data center solutions market is expanding rapidly, with a projected market size anticipated to rise from about USD 448.95 billion in 2025 to USD 1,105.28 billion by 2030, featuring a CAGR of 19.7% during the forecast period. The rapid growth of AI and high-performance computing (HPC) workloads is pushing demand for high-density infrastructure, where enterprises now require advanced systems capable of supporting 40–60 kW per rack with liquid cooling solutions to ensure performance and thermal efficiency.
Simultaneously, a hyperscale capex super-cycle is fueling record levels of infrastructure spending, with cloud and tech giants expanding data center capacity globally to keep pace with soaring compute demand, accelerating build-outs and technology refresh cycles. In parallel, rising pressure from regulatory bodies and ESG mandates is driving a shift toward power and cooling modernization, prompting operators to adopt energy-efficient designs, sustainable cooling technologies, and stricter compliance frameworks. These developments are transforming IT infrastructure strategies, making data center solutions essential for digital growth. They provide scalable, efficient, and regulation-compliant environments that address the evolving performance, sustainability, and compliance requirements of modern enterprises.
Top Data Center Solutions Companies Include:
These companies use and provide data center solutions to innovate faster, adapt to changing demands, and deliver smarter connected experiences. Integrating artificial intelligence and optimizing embedded systems enables companies to enhance performance, shorten time to market, and maintain global competitiveness.
In May 2025, Dell unveiled the PowerEdge XE9780L and XE978SL servers, both equipped with PowerCool eRDHx liquid cooling and an Integrated Rack Controller for advanced thermal management. These servers are optimized for high-density AI, supporting up to 256 GPUs per rack and slashing cooling energy use by up to 60%. The PowerCool system uses warm water (32–36°C) to handle all IT-generated heat, removing the need for chillers and enabling up to 16% more racks per data center without increasing total power. With modular, hot-swappable fan units and comprehensive rack-scale monitoring, these servers deliver efficient, scalable, and reliable infrastructure for demanding, energy-conscious AI workloads.
In June 2025, HPE launched the ProLiant DL325 and DL345 Gen12 servers, equipped with 5th Gen AMD EPYC processors. These next-generation servers double memory capacity to 6 TB, delivering robust support for demanding virtualization, VDI, and container workloads. They feature enhanced AI-driven management with HPE Compute Ops Management, streamlining deployment, monitoring, and automation for greater efficiency. Advanced security is built through HPE iLO 7, which provides silicon-level protections to address current threats and future quantum computing risks. Design improvements and increased memory make these systems a flexible, secure, and reliable foundation for modern data centers looking to boost performance without compromising security or manageability.
Dell Technologies
Dell Technologies continues to strengthen its leadership in the data center solutions market through a strategy focused on delivering scalable, energy-efficient, and fully automated infrastructure for hybrid, edge, and multi-cloud environments. The company’s approach emphasizes modular data center architectures, advanced liquid cooling solutions, and AI-driven automation to meet the demands of high-performance and sustainable computing. The company’s core competencies include deep domain expertise in enterprise servers, storage, and networking, paired with integrated cybersecurity, cloud management, and AIOps capabilities. Dell enhanced its portfolio through strategic acquisitions, including Moogsoft in July 2023, which brought advanced AI-based observability to its IT operations, and Cloudify in January 2023, a player in environment-as-a-service and cloud orchestration.
These acquisitions align with Dell’s goal of streamlining application deployment across complex cloud environments and improving operational efficiency. Dell adopts a primarily horizontal integration strategy, combining best-of-breed infrastructure and software with a broad partner ecosystem to deliver flexible, vendor-neutral solutions. This allows seamless interoperability across third-party platforms while optimizing performance and cost. With ongoing innovation, strategic partnerships, and a focus on automation and sustainability, Dell Technologies continues to shape the future of modern data center ecosystems.
Nvidia
Nvidia established itself as a key player in the data center solutions market by strategically focusing on full-stack computing, cloud integration, and developer enablement. The company’s core strategy is delivering high-performance, scalable infrastructure by aligning advanced GPU technology with software platforms that support modern workloads such as machine learning, data analytics, and high-throughput networking. Nvidia’s core competencies lie in GPU acceleration, platform-level integration, network automation, and developer-focused tools that facilitate workload orchestration across diverse environments.
In July 2024, the company acquired Brev.Dev, enhancing developer access to GPU resources across multi-cloud platforms. In December 2024, Nvidia acquired Augtera Networks, bringing network observability and automation to strengthen real-time IT operations. In March 2025, Nvidia acquired Gretel, adding synthetic data generation capabilities to support privacy-compliant model training at scale. These acquisitions align with Nvidia’s broader horizontal integration strategy, enriching its ecosystem with specialized technologies that complement its hardware and software offerings. With strong industry partnerships and a focus on platform interoperability, Nvidia continues to deliver practical, enterprise-grade solutions tailored to evolving data center demands.
Broadcom
Broadcom plays a vital role in the data center solutions market by providing high-performance networking, storage, and broadband connectivity technologies. Its portfolio includes key components like Ethernet switches, ASICs, and Fibre Channel adapters that power hyperscale and enterprise data centers. Broadcom’s innovations in silicon and software-defined infrastructure enable faster data transfer, reduced latency, and improved scalability for cloud service providers and large-scale IT operations.
Hewlett Packard Enterprise (HPE)
HPE offers comprehensive data center solutions encompassing compute, storage, networking, and software-defined infrastructure. Through its HPE GreenLake edge-to-cloud platform, the company delivers as-a-service solutions for hybrid and private cloud environments. HPE’s modular, energy-efficient, and AI-integrated systems help enterprises modernize their data centers, enhance agility, and manage workloads across on-premise and cloud ecosystems with improved cost-efficiency.
Supermicro Computer Inc.
Supermicro is a leading provider of high-performance, energy-efficient server and storage solutions tailored for data centers, cloud computing, AI, and edge applications. Known for its Building Block Solutions®, Supermicro delivers customizable hardware platforms that support a wide range of workloads. Its innovative approach focuses on optimizing density, cooling, and power efficiency, making it a preferred choice for hyperscale data centers and enterprise IT environments seeking flexibility and performance.
Market Ranking
In 2025, the data center solutions market remains highly competitive, with Dell Technologies, Broadcom, Nvidia, HPE, and Super Micro Computer Inc. collectively holding approximately 30–35% of the total market share. In May 2025, Dell launched its PowerEdge XE9780L and XE9785L server platforms, featuring advanced liquid cooling and up to 192 Nvidia Blackwell Ultra GPUs per rack to meet skyrocketing demand for AI infrastructure and improve energy efficiency.
Earlier, in March 2025, Nvidia introduced the Blackwell Ultra platform and GB300 NVL72 rack-scale solution, delivering superior performance and seamless integration for high-density AI deployments. In May 2024, Broadcom released new 400 G PCIe Gen5 Ethernet adapters. Then, in March 2025, it launched co-packaged optics and PCIe Gen6 solutions, which enable faster and lower-power networking that directly supports hyperscale and cloud workloads.
In June 2025, HPE expanded its ProLiant Compute Gen12 line with the DL325 and DL345 servers, providing up to 6TB of memory, silicon-level security, and machine learning-driven management for high-intensity enterprise applications. Super Micro Computer Inc. began shipping its new 4-socket X14 servers in July 2025, offering support for the latest Intel Xeon 6 processors and up to 16TB of memory, ideal for mission-critical, high-performance computing environments. These developments highlight how established technology providers are responding to the rapid adoption of AI, edge computing, and hybrid cloud deployments by investing in scalable, energy-efficient, and secure infrastructure. This competitive environment highlights both opportunities and challenges for vendors and solution providers to offer high-performing, sustainable, and ready solutions for increasingly complex enterprise needs.
Related Reports:
Data Center Solutions Market by Infrastructure (IT (Server, Storage, Network), Power (Generator, UPS, Switchgear, PDU, Switchboard), Cooling (CRAC & CRAH, Chiller, Heat Exchanger, CDU)), Rack (Enclosed, Open Frame), Software (DCIM, BMS) - Forecast to 2030
Contact:
Mr. Rohan Salgarkar
MarketsandMarkets Inc.
1615 South Congress Ave.
Suite 103,
Delray Beach, FL 33445
USA : 1-888-600-6441
[email protected]
This FREE sample includes market data points, ranging from trend analyses to market estimates & forecasts. See for yourself.
SEND ME A FREE SAMPLE